Power Meter and Hook Up Installed

The site has been very active this week. Highlights include:

  • installation of the transformer and generator
  • the new sprinkler riser room
  • p-gravel at front entrance
  • stainless steel bollards and handrails
  • stamped concrete at the front entrance